diff mbox

[PULL,01/61] commit: Fix completion with extra reference

Message ID 1498234919-27316-2-git-send-email-kwolf@redhat.com
State New
Headers show

Commit Message

Kevin Wolf June 23, 2017, 4:20 p.m. UTC
commit_complete() can't assume that after its block_job_completed() the
job is actually immediately freed; someone else may still be holding
references. In this case, the op blockers on the intermediate nodes make
the graph reconfiguration in the completion code fail.

Call block_job_remove_all_bdrv() manually so that we know for sure that
any blockers on intermediate nodes are given up.

Cc: qemu-stable@nongnu.org
Signed-off-by: Kevin Wolf <kwolf@redhat.com>
Reviewed-by: Eric Blake <eblake@redhat.com>
Reviewed-by: Max Reitz <mreitz@redhat.com>
---
 block/commit.c | 7 +++++++
 1 file changed, 7 insertions(+)
diff mbox

Patch

diff --git a/block/commit.c b/block/commit.c
index af6fa68..8c09c3d 100644
--- a/block/commit.c
+++ b/block/commit.c
@@ -119,6 +119,13 @@  static void commit_complete(BlockJob *job, void *opaque)
     }
     g_free(s->backing_file_str);
     blk_unref(s->top);
+
+    /* If there is more than one reference to the job (e.g. if called from
+     * block_job_finish_sync()), block_job_completed() won't free it and
+     * therefore the blockers on the intermediate nodes remain. This would
+     * cause bdrv_set_backing_hd() to fail. */
+    block_job_remove_all_bdrv(job);
+
     block_job_completed(&s->common, ret);
     g_free(data);